Project Description
The 250.000m2 plant consists of 12 production halls, which are equipped with gang-saws and bloc cutter for the big slabs and strips.
The finishing department for slabs and tiles allow producing all possible sizes with wide range of surfaces finishing.
The waste management In Both the quarrying and manufacturing is applied with a greatest attention to the environment.
- Client: El-Sakhr El-Arabi for Marble
- Location: Egypt
- Scope:
-
- Industrial Planning
- Integrated Design
- Project Management
- Site Supervision
- Machinery Installation Supervision
- Waste treatment







